When process risks are identified (WST) such as defect occurrence, new development, or 4M changes, inspection cycles are halved and sample quantities are doubled. Conversely, when stable mass production is maintained for more than 3 months without defects (BST), inspection cycles are doubled and quantities are halved.
Quality Management System by Process
Mixing
We manage feedstock density, color, and uniformity from the start
Injection
We evaluate molding quality based on two criteria: weight and appearance
Debinding
We verify binder removal status through debinding rate and color
Sintering
We finalize quality based on three criteria: dimensions, density, and appearance